Blog
Market·19 July 2026·5 min read

Dubai Unveils Latifa bint Hamdan Corridor: 12km for 650,000 Residents by 2028

Render RTA del corridoio Latifa bint Hamdan: nuova arteria a piu corsie con svincoli e pista ciclabile a Dubai
LV

In short

Dubai's Roads and Transport Authority has awarded a AED 2 billion contract for the Latifa bint Hamdan Corridor: a new 12km artery linking Sheikh Zayed Road, Al Khail Road, Al Meydan Street, Sheikh Mohammed bin Zayed Road and Sheikh Zayed bin Hamdan Al Nahyan Street to Emirates Road. Due by 2028, the project will serve more than 650,000 residents and cut travel time by up to 54% on key stretches.

Dubai's Roads and Transport Authority (RTA) has awarded the contract for the Latifa bint Hamdan Corridor Development Project, a new 12 kilometre artery worth AED 2 billion (around $545 million) that will link six of the city's busiest roads.

The corridor will connect Sheikh Zayed Road, Al Khail Road, Al Meydan Street, Sheikh Mohammed bin Zayed Road and Sheikh Zayed bin Hamdan Al Nahyan Street through to Emirates Road, creating a continuous east-west axis designed to absorb traffic generated by the growing residential communities along the route.

What the project includes

The plan includes 15 grade-separated structures: seven bridges spanning 2.3km in total and eight tunnels covering 900 metres. Latifa bint Hamdan Street will be widened to four lanes in each direction, raising capacity to around 16,000 vehicles per hour in both directions. The project also includes 12.5km of cycling tracks connecting the existing network between Al Qudra and Jumeirah.

Faster journeys, more communities served

The most immediate benefit for motorists concerns the stretch between Umm Al Sheif Street and Emirates Road, where travel time will drop from 33 to 15 minutes, a 54% cut. The RTA also expects a 12% increase in east-west road network capacity, with benefits extending to Al Khail Road, Dubai-Al Ain Road, Umm Suqeim Street and Sheikh Mohammed bin Zayed Road.

Once complete by the end of 2028, the corridor will serve more than 650,000 residents and visitors and handle over 130,000 vehicle trips a day. Connected areas include Nad Al Sheba, Al Barari, Dubai Hills, Dubai District One, Mohammed Bin Rashid Gardens, Living Legends, Majan and Global Village.

MetricValue
Length12 km
InvestmentAED 2 billion (around $545 million)
Expected completionEnd of 2028
People servedOver 650,000
Daily vehicle tripsOver 130,000
Travel time cut (Umm Al Sheif, Emirates Road)-54% (from 33 to 15 minutes)
Source: Dubai RTA, as reported by Khaleej Times and Gulf News, July 2026

Original source

Article based on Dubai’s new 12km corridor to serve 650,000 people by 2028RTA / Gulf Business, Khaleej Times · 12 Jul 2026. Reading, analysis and commentary are original.

Frequently asked

What is the Latifa bint Hamdan Corridor?

It is a new 12km road artery being developed by Dubai's RTA to connect Sheikh Zayed Road, Al Khail Road, Al Meydan Street, Sheikh Mohammed bin Zayed Road and Sheikh Zayed bin Hamdan Al Nahyan Street through to Emirates Road.

When will it be completed?

The project is scheduled for completion by the end of 2028.

How much does the project cost?

The RTA awarded a contract worth AED 2 billion, around $545 million.

Which communities benefit from the new infrastructure?

Served areas include Nad Al Sheba, Al Barari, Dubai Hills, Dubai District One, Mohammed Bin Rashid Gardens, Living Legends, Majan and Global Village.

How much shorter will travel times be?

On the stretch between Umm Al Sheif Street and Emirates Road, travel time will drop from 33 to 15 minutes, a 54% cut.

Interested in an area along the new corridor?

Dubai Hills, Al Barari and Mohammed Bin Rashid Gardens are among the areas set to benefit from the new connectivity. Let's see which investment profile fits your goal best.